Differences

This shows you the differences between two versions of the page.

Link to this comparison view

dsm:assignments:01 [2026/10/04 16:19]
emilian.radoi
dsm:assignments:01 [2026/10/04 16:41] (current)
emilian.radoi
Line 1: Line 1:
 ===== Project ===== ===== Project =====
  
-<​hidden>​ 
   * **Team**: 2 members.   * **Team**: 2 members.
   * **Project Selection**:​   * **Project Selection**:​
Line 19: Line 18:
 === Milestones and Deliverables === === Milestones and Deliverables ===
  
-== 1. M1 (03.11.25) - Related Work / State-of-the-Art Review + Presentation (1p) ==+== 1. M1 (02.11.25) - Related Work / State-of-the-Art Review + Presentation (1.5p) ==
   * **Objective**:​ Establish the research context by reviewing and summarising related work (existing studies and relevant literature related to your topic).   * **Objective**:​ Establish the research context by reviewing and summarising related work (existing studies and relevant literature related to your topic).
     * **Action Items**:     * **Action Items**:
Line 38: Line 37:
       * Prepare a 5 minute presentation (with slides) that summarises your review.       * Prepare a 5 minute presentation (with slides) that summarises your review.
       * State the topic / problem, the context, and the direction you intend to pursue (your research questions).       * State the topic / problem, the context, and the direction you intend to pursue (your research questions).
-      * Your M1 score will be determined based on the presentation.+      * Your M1 score will be determined based on the presentation. Both team members must contribute to the presentation.
   * **Tips**:   * **Tips**:
     * How to read research papers efficiently - [[https://​dslsrv1.rnet.missouri.edu/​resources/​HowToReadAPaper.pdf | the 3-pass method]].     * How to read research papers efficiently - [[https://​dslsrv1.rnet.missouri.edu/​resources/​HowToReadAPaper.pdf | the 3-pass method]].
Line 52: Line 51:
  
   ​   ​
-== 2. M2 (28.11.25) - Dataset Collection and Baseline Results (1p) ==+== 2. M2 (27.11.25) - Dataset Collection and Baseline Results (0.5p) ==
   * **Objective**:​ Obtain the datasets required for your project and implement a baseline model for comparison.   * **Objective**:​ Obtain the datasets required for your project and implement a baseline model for comparison.
     * **Action Items**:     * **Action Items**:
Line 71: Line 70:
  
  
-== 3. M3 (19.12.25) - Own Contribution (1p) ==+== 3. M3 (18.12.25) - Own Contribution (0.5p) ==
   * **Objective**:​ Develop and implement your original contribution to the field, either by addressing a new research problem or improving an existing approach.   * **Objective**:​ Develop and implement your original contribution to the field, either by addressing a new research problem or improving an existing approach.
     * **Types of contributions**:​     * **Types of contributions**:​
Line 90: Line 89:
  
  
-== 4. M4 (12.01.25) - Final paper + Presentation (1p) ==+== 4. M4 (11.01.25) - Final paper + Presentation (1.5p) ==
   * **Objective**:​ Compile your project into a well-organised academic report.   * **Objective**:​ Compile your project into a well-organised academic report.
     * **Action Items**:     * **Action Items**:
Line 110: Line 109:
         * Conclusions and potential areas for future research.         * Conclusions and potential areas for future research.
       * **Presentations tips**: create well-polished slides with clear visuals, including figures, graphs and performance metrics.       * **Presentations tips**: create well-polished slides with clear visuals, including figures, graphs and performance metrics.
-    * **Evaluation**:​ The presentation will be graded based on clarity, depth of explanation,​ the quality of results and the Q&A section. The final project ​grade will be weighted ​based on the presentation quality.+    * **Evaluation**:​ The presentation will be graded based on clarity, depth of explanation,​ the quality of results and the Q&A section. The M4 grade is determined ​based on the presentation quality. Both team members must contribute to the presentation.
     * **Upload M4 (Documentation and Slides)**: [[https://​curs.upb.ro/​2025/​mod/​assign/​view.php?​id=24456|Upload]] must contain title and authors.     * **Upload M4 (Documentation and Slides)**: [[https://​curs.upb.ro/​2025/​mod/​assign/​view.php?​id=24456|Upload]] must contain title and authors.
  
Line 118: Line 117:
 ==== Grading System ==== ==== Grading System ====
   * **Total Points** = M1 + M2 + M3 + M4   * **Total Points** = M1 + M2 + M3 + M4
-    * M1 and M4 will have their grade (G) scaled by the score of the presentation (P): TOTAL = G * P  
  
 ---- ----
Line 173: Line 171:
   * **Error analysis on the baseline**: You can analyse the errors made by your baseline and try to propose targeted solutions. In this case, the baseline should be a well performing model from the related work, not a simple finetuned architecture.   * **Error analysis on the baseline**: You can analyse the errors made by your baseline and try to propose targeted solutions. In this case, the baseline should be a well performing model from the related work, not a simple finetuned architecture.
  
-</​hidden>​+
dsm/assignments/01.1791119988.txt.gz ยท Last modified: 2026/10/04 16:19 by emilian.radoi